Cleanroom Commissioning

Before Testing & Validation we undertake commissioning to the following procedure checklist:

Cleanroom (HVAC System) Commissioning

  • Hydronic Balance Testing
  • Sound Measurement Testing
  • Vibration Testing
  • Alarms and Interlocks Testing
  • Air Flow rate testing in ductwork
  • Air Volume Supply and Return, Testing and
  • Balancing
  • Fan RPM and Amperage Confirmation
  • Temperature, Humidity (Coil Duties) and
  • Static Pressure Testing (Duct Leak)
  • Differential Pressure Testing and Balancing
  • Loop Checks
  • Filter Integrity Testing
  • Component (Air coil, AHU, FCU, Filters)
  • Operation Testing (Test sequences, Shutdown,
  • and Start-up Procedures)
  • Process and Instrumentation Diagram
  • (P&ID) confirmation = As-Built P&ID
  • Utilities Check
  • Instrumentation Calibration
  • Electrical Power Tests
  • Motor Run Tests
  • Lubrication Checks
  • Isometric Drawing Checks
  • Safety Checks

Cleanroom (Finishing) Commissioning

  • Floor, Wall, Ceiling – leakage & cleanliness
  • Doors and Airlocks and Interlocks
  • Lighting and other Fixtures
  • Cleaning